Year |
Client |
Project |
Job Description |
PrNo |
2009 |
2009 |
AS Nymo, Norway |
National Oilwell, Drillmax IV drilling rig, Toilet module. |
Design, engineering and production of prefabricated aluminium toilet module. |
08P16 |
2009 |
AS Nymo, Norway |
ORS - Awilco COSL Target drilling rig, Toilet module. |
Design, engineering and production of prefabricated aluminium toilet module. |
08P60 |
2008 |
2008 |
Master Marine ASA, Norway |
Ekofisk, Service Jack 1. |
Design, engineering and architectural work at the permanent living quarter onboard Service Jack 1, according to NORSOK standard. |
08P51 |
2008 |
Master Marine ASA, Norway |
Ekofisk, Service Jack 1. |
Design, engineering and production of 3 Modules for LQ housing 290 single rooms, according to NORSOK standard. |
08P20 |
2008 |
APL, Norway |
Cascade & Chinook, Utility modul, half round. |
Design, engineering and production of a utility module for housing the technical equipment for the STP system. |
08P27 |
2008 |
Seadrill AS, Norway |
West Alpha Drilling Rig, Recreation room, Cinema. |
Design, engineering and interior work, fitting up the rest room and the cinema, new interior, new furniture. |
07P66 |
2008 |
Aker Kværner, Norway |
Gjøa, Paintshop. |
Design, engineering and production of prefabricated aluminium paint shop and waste module. |
07P85 |
2007 |
2007 |
Ugland Marine Services AS, Norway |
Favorita, Navigation module. |
Engineering and building of new navigation container. |
07P35 |
2007 |
AS Nymo, Norway |
ORS Awilco, Wil Promor drilling rig, Toilet module. |
Design, engineering and production of prefabricated aluminium toilet module. |
07P60 |
2007 |
AS Nymo, Norway |
Stena Drillmaks 3, Toilet module. |
Design, engineering and production of prefabricated aluminium toilet module. |
07P46 |
2007 |
AS Nymo, Norway |
ORS Awilco, Wil Invator drilling rig, Toilet module. |
Design, engineering and production of prefabricated aluminium toilet module. |
07P47 |
2007 |
Statoil / Seadrill, Norway |
Seadrill, West Epsilon drilling rig, Prefab. meeting room. |
Delivery and detail engineering of prefabricated meeting room module. Structural analysis of module structure. Aluminium structure. |
07P12 |
2007 |
MAS / Fjord Technology, Norway |
Hydraulic Module, Aker Floating Production, AFP Reliance FPSO. |
Delivery and detail engineering of prefabricated hydraulic module. Structural analysis of module structure. |
07P08 |
2007 |
Statoil ASA, Norway |
Statoil Gullfaks C, New transformer module. |
Delivery and detail engineering new transformer module (flat pack). Structural analysis of module structure. Stainless steel structure. |
06P71 |
2006 |
2006 |
BG Gas, India / Flexmodule Asia Pte Ltd, Singapore |
Panna Mukta Platform, Prefabricated control room. |
Assist Flexmodule Asia in delivery of new control room module. Structural analysis of module structure. |
06P43 |
2006 |
AS Nymo, Norway |
ORS Awilco, Wil Pioneer drilling rig, Toilet module. |
Design, engineering and follow-up on all disciplines in delivery of prefabricated aluminium module. |
06P65 |
2006 |
Norsk Hydro ASA, Norway |
Njord B, LQ Modification. |
Delivery, design and detail engineering of rebuilding double cabins into single cabins. |
06P46 |
2006 |
Norsk Hydro ASA, Norway |
Njord A, LQ Extention. |
Delivery, design and detail engineering of new living quarter extension. Structural analysis of new and existing LQ (exist LQ is stressed skin aluminium). |
06P17 |
2006 |
Conoco Phillips, Norway |
Elda, Ekofisk modifications, Trim room module. |
Delivery and detail engineering of new trim room module (flat pack). Aluminium structure. |
05P16 |
2006 |
AS Nymo, Norway |
National Oilwell, Stena Drilling, Stena Drillmax I & II, 2 Toilet modules. |
Design, engineering and follow-up on all disciplines in delivery of prefabricated aluminium modules. |
05P61 |
2005 |
2005 |
Conoco Phillips, Norway |
Elda, Ekofisk modifications, Office module study. |
Delivery and detail engineering of new office module as Flexmodule (flat pack). Aluminium structure. |
05P16 |
2005 |
Statoil ASA, Norway |
Huldra LQE. |
Detailed study of additional LQ (20 pers.). Application of light weight Flexmodule concept systems and cost / planning analysis. |
05P15 |
2004 |
2004 |
Aker Reinertsen AS, Norway |
Statoil ASA Norne FPSO. |
Delivery of LER-module. Stainless steel structure. |
04P08 |
2004 |
Dolphin AS / MSS AS, Norway |
Bideford Dolphin, Additional cabins. |
EPC delivery of 3 prefabricated cabin modules and stairtower module. |
01P47 |
2003 |
2003 |
Statoil ASA, Norway |
Statoil Statfjord A, Additional office and storage modules. |
EPC delivery of 4 storey office module and separate storage module. Stainless steel structure. |
03P42 |
2003 |
Exmar Offshore / DV Offshore, France |
Barge LB 4000, Furniture and additional office modules. |
EPC delivery of cabin furniture for 98 existing cabins, public room furniture and 2 prefabricated modules with 4 double offices. |
02P58 |
2002 |
2002 |
Exmar Offshore / DV Offshore, France |
Barge LB 4000, Additional LQ. |
Project management and detail engineering in the supply of a 102 person LQ and a change room module. EPC partner project between MSS AS, Markhus AS and AS Nymo. |
02P24 |
2002 |
Heerema Tønsberg AS, Norway |
Statoil ASA Kvitebjørn Drilling. |
Project management and detail engineering in the supply of a toilet module. |
01P26 |
2002 |
Heerema Tønsberg AS, Norway |
BP Norway, Valhall Flank North, Wellhead platform. |
EPC contract on delivery of 4 prefabricated modules containing emergency overnight accomodation (12 pers.), offices, workshop, battery room, hv-room, lv-room, local equipment room and HVAC Room. Stainless steel structure. |
02P20 |
2002 |
Heerema Tønsberg AS, Norway |
Esso Norway, Ringhorne. |
EPC contract on delivery of 2 prefabricated office modules. |
02P07 |
2002 |
Statoil ASA, Norway |
Statoil Statfjord A, Control Room Module in UM 6. |
EPC delivery of a prefabricated module designed for vertical end lifting. Complete with ext. stairs and supports. |
01P16 |
2001 |
2001 |
Heerema Tønsberg AS, Norway |
BP Norway, Valhall Flank South, Wellhead platform. |
EPC contract on delivery of 4 prefabricated modules containing emergency overnight accomodation (12 pers.), offices, workshop, battery room, hv-room, lv-room, local equipment room and HVAC Room. Stainless steel structure. |
01P52 |
2001 |
Heerema / RDS / Hydralift, England |
Statoil Kvitebjørn Drilling. |
Detail design and delivery of 4 prefabricated acoustic rooms (modules). Stainless steel structure. |
01P26 |
2001 |
Statoil ASA, Norway |
Statoil Statfjord A, Additional modules, VMS 105 152. |
Partner project with AS Nymo. EPC contract on delivery of office module, coffebar and mud lab. Stainless steel structure. |
00P52 00P34 |
2000 |
2000 |
Statoil ASA, Norway |
Statoil Statfjord A, Additional modules, VMS 105 152. |
Partner project with A/S Nymo. EPC contract on delivery of emergency hospital module, trimroom module, change room module and wellbeing centres. |
99P47 |
1994 |
1994 |
Markhus AS, Norway |
St. Franciskus School, Arendal. |
Preliminary classroom. Design and fabrication drawings of prefabrication module. |
94P67 |
1994 |
Statoil ASA, Norway |
Statfjord A, WC-container. |
Design and follow-up on all disciplines. |
94P16 |